Revision as of 15:19, 15 April 2011 by Noctolater (talk | contribs) (Created page with "Starting simple this is the most basic set up without omitting the MFE Transmitter. The max Cable length is achieved here. The cable is 6 long then the receiver is counted as the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Starting simple this is the most basic set up without omitting the MFE Transmitter. The max Cable length is achieved here. The cable is 6 long then the receiver is counted as the last hence 7 long. Loss is calculated at every 5 length, but you are given a buffer of 2 for the first segment. You lose 1 EU at every lenght that is too long.

I vote to change this to:

This is the most basic setup: The max Cable length without loss is 9 pieces of cable, with the MFE Transmitter where the 10th piece would go. Energy loss happens when you go over 9 cable lengths. At that point, you lose 1 energy for every 3 more cable you place down. That is, at 10 cable, -1 EU; at 13 cable, -2 EU; at 16 cable, -3 EU; etc...