Talk:Electro Furnace

From Industrial-Craft-Wiki
Revision as of 07:02, 1 January 2012 by Trifler (talk | contribs) (Need to know how many EU per operation)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

EU per Operation[edit]

We know that the regular Furnace takes 200 Heat Units per operation and the Iron Furnace takes 160 Heat Units per operation, so we need to list how many EU it takes per operation. --Trifler 08:02, 1 January 2012 (CET)